Project Description
Client: Shepley Engineers Ltd
Location: London SW1A
Size: 700m²
Description: To take up and renew 700m² of mastic asphalt, including all leadworks to ensure roof areas were installed exactly as existing.
MAC Member: Allard Construction
Manufacturer: IKO PLC